What information regarding cement is NOT required on the delivery ticket?

  1. The type of cement used

  2. The manufacturer of the cement

  3. The specific gravity of the cement

  4. The weight of the cement batch

The correct answer is: The specific gravity of the cement

The specific gravity of the cement is not required on the delivery ticket because this measurement is primarily used for various calculations and quality control purposes within the batching process rather than being necessary for individual delivery documentation. In general, delivery tickets are intended to provide essential information relevant to the actual products being delivered to the site, such as the type and manufacturer of the cement, as well as the weight of the cement batch being supplied. These pieces of information are crucial for ensuring that the correct materials are being used according to project specifications and standards. Therefore, while specific gravity is important in the larger context of mixing and materials engineering, it does not need to be included on a delivery ticket since it does not directly impact the delivery or immediate usage of cement in the batching process.