What is the formula used to calculate Total Moisture Content?

  1. Total Moisture = (wet + dry) / dry

  2. Total Moisture = (wet - dry) * 100 / dry

  3. Total Moisture = (wet - dry) / dry * 100

  4. Total Moisture = wet / dry - 100

The correct answer is: Total Moisture = (wet - dry) / dry * 100

The formula for calculating Total Moisture Content, represented as a percentage, is derived from the relationship between the wet weight of a material and its dry weight. The correct formula, which indicates Total Moisture is equal to the difference between the wet and dry weights divided by the dry weight and then multiplied by 100, effectively expresses Total Moisture as a ratio of how much additional moisture is present compared to the dry state. Using this formula, Total Moisture Content measures how much moisture is in the sample relative to the dry weight, which is crucial in concrete production for maintaining the right mix and ensuring the desired properties of the concrete. The multiplication by 100 converts the ratio into a percentage, making it easier for operators to understand and apply the moisture levels in practical contexts. This understanding is essential for concrete batch operators to ensure proper water-cement ratios are maintained, which affects the strength and durability of the final product.