When should water storage tanks on mixers be filled?

  1. After mixing and before leaving

  2. After reporting water used and before leaving

  3. After arrival at the site and before mixing

  4. Before mixing and after delivery

The correct answer is: After reporting water used and before leaving

The correct answer emphasizes the importance of accurately managing resources at the concrete mixing site, specifically regarding water usage. Water is a critical component in the concrete mixing process, impacting the mixture's consistency and workability. By filling the water storage tanks after reporting the amount of water used, operators ensure that they are accounting for all materials accurately, which is essential for quality control and project compliance. This process prevents unnecessary wastage or inadequate mixing due to miscalculations. It reinforces the practice of systematic reporting and management of resources, aligning with best practices in construction and concrete operations. This ensures that the next batch can be prepared efficiently and that any discrepancies in water usage can be addressed in real-time, upholding the quality standards required for concrete projects. The other options do not take into account the need for accurate resource reporting and management prior to filling the tanks, which can lead to inefficiencies or quality issues in the mixing process.