Where should the water storage tanks be filled during the preparation of concrete?

  1. After loading cement but before leaving the plant

  2. After mixing and loading aggregates

  3. After reporting water used and before leaving for the site

  4. Before mixing and after arrival on site

The correct answer is: After reporting water used and before leaving for the site

Filling the water storage tanks after reporting the water used and before leaving for the site is crucial for several reasons. This sequence ensures that the operator has accurate data regarding the amount of water being used in the concrete mix. By documenting the water quantity before departing, it allows for better quality control and consistency of the concrete mixture, which is vital for meeting the required standards and specifications for the job at hand. Moreover, this practice helps in maintaining the integrity of the batching process. By confirming the water used prior to leaving, it provides an opportunity to make adjustments if necessary, ensuring that the proper water-to-cement ratio is honored. This process of careful tracking also aligns with industry best practices which prioritize accurate record-keeping and preparation to prevent any issues that could arise due to improper mixing ratios later in the project. The other choices may not prioritize the necessary record-keeping before heading to the site, which is why they do not support the best practices for ensuring quality concrete delivery.